Expansion on the five stages involved in the SDLC

13 Feb

Each phase…[as part of the SDLC] produces deliverables required by the next phase in the life cycle.  Requirements are translated into design.  Code is produced during implementation that is driven by the design. Testing verifies the deliverable of the implementation phase against requirements.

Requirements

Business requirements are gathered in this phase.  This phase is the main focus of the project managers and stake holders. Meetings with managers, stake holders and users are held in order to determine the requirements.  Who is going to use the system? How will they use the system?  What data should be input into the system?  What data should be output by the system?  These are general questions that get answered during a requirements gathering phase.  This produces a nice big list of functionality that the system should provide, which describes functions the system should perform, business logic that processes data, what data is stored and used by the system, and how the user interface should work.  The overall result is the system as a whole and how it performs, not how it is actually going to do it.

Design

The software system design is produced from the results of the requirements phase.  Architects have the ball in their court during this phase and this is the phase in which their focus lies.  This is where the details on how the system will work is produced.  Architecture, including hardware and software, communication, software design (UML is produced here) are all part of the deliverables of a design phase.

Implementation

Code is produced from the deliverables of the design phase during implementation, and this is the longest phase of the software development life cycle.  For a developer, this is the main focus of the life cycle because this is where the code is produced. Implementation my overlap with both the design and testing phases.  Many tools exists (CASE tools) to actually automate the production of code using information gathered and produced during the design phase.

Testing

During testing, the implementation is tested against the requirements to make sure that the product is actually solving the needs addressed and gathered during the requirements phase.  Unit tests and system/acceptance tests are done during this phase. Unit tests act on a specific component of the system, while system tests act on the system as a whole.

Reference:

http://codebetter.com/raymondlewallen/2005/07/13/software-development-life-cycle-models/

There are two different types of SDLC that can be used: waterfall and agile. The major difference between the two is that the waterfall process is more traditional and begins with a well thought out plan and defined set of requirements whereas agile SDLC begins with less stringent guidelines and then makes adjustments as needed throughout the process. Agile development is known for its ability to quickly translate an application that is in development to a full release at nearly any stage, making it well suited for applications that are updated frequently.

Reference:

http://www.veracode.com/security/software-development-lifecycle

One Response to “Expansion on the five stages involved in the SDLC”

  1. sad112759089 February 15, 2013 at 3:11 pm #

    Great blog and layout!

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: